Each rule below comes from the City of Tempe and changes how we plan a job here. We check them before we quote.
Patio and bar soundTempe repealed its numeric decibel limits in March 2022. The test now is whether noise is unnecessary, excessive or offensive and disturbs the peace of a neighborhood. The City looks at the time of day, the distance to homes and whether the noise is commercial. Civil fines run $100 to $1,000, and each day counts as a separate offense.
Source: Tempe City Code Ch. 20, Secs. 20-6, 20-11, 20-15, 20-17
Window signsA sign in a window of a commercial, industrial or mixed-use building is limited to 25% of the window area, and glass doors count as windows. Permanent window signs within that limit need no permit. The code doesn't say whether a video screen behind glass is a sign, so we ask Code Compliance before we hang one that faces out.
Source: City of Tempe, Signs FAQ; ZDC Sec. 4-903, type M
Lit sign permitsEvery illuminated sign except an address sign needs a sign permit. Applications must come from an Arizona sign contractor holding an active CR-38 license, and signs installed without a permit pay double.
Source: City of Tempe, Signs FAQ; ZDC Sec. 4-902(H)(4)
Low-voltage permitsTempe's Administrative Code exempts Class 2 and Class 3 control and signal circuits not essential to human life from the electrical permit. The City doesn't say which AV, data or camera systems qualify, so we confirm with the Permit Center before we start.
Source: Tempe Administrative Code 105.2 (City Code Ch. 8, Art. I)
Security plansBars, cocktail lounges, taverns, dance clubs and nightclubs must file a security plan with the Police Department. Outdoor seating where liquor is consumed needs a liquor license and a security plan as well. Running without an approved plan, or not following it, is a violation.
Source: Tempe City Code Sec. 26-70; ZDC Sec. 3-425(B)(2)
Building codesTempe adopted the 2024 I-Codes and the 2023 National Electrical Code with local amendments, effective July 1, 2026. Through December 31, 2026 an application can be filed under the 2018 or the 2024 codes. From January 1, 2027 every application must meet the 2024 codes.
Source: City of Tempe, Building Codes and Amendments